NADI What it is What it found How it was checked Open the atlas
National Atlas of Drainage Intelligence · India

Every river in India, measured the same way.

212 named catchments. Twenty morphometric parameters computed identically for every one of them, from one elevation model and one channel network — and every figure printed beside the published figure it should match.

Runs in your browser· No account· No server· CC BY 4.0· doi.org/10.5281/zenodo.23568570
01 · The problem

Indian morphometry is published one watershed at a time. Each study picks its own elevation model and its own stream threshold.

02 · Why it matters

So the numbers cannot be added up, ranked or regressed. They measure different things under the same name.

03 · What was done

One elevation model, one channel network, one threshold, one projection — applied to all 212 catchments alike.

04 · And the hard part

Every figure is printed beside the published figure it should match — including where the two disagree.

What it is

A uniform description of India's drainage, built so the numbers can be compared.

NADI delineates 212 named river catchments, nested four levels deep across 124 basins, from the HydroSHEDS v1 conditioned elevation model. For each one it computes the classical morphometric suite — drainage density, stream frequency, bifurcation ratio, hypsometric integral, relief ratio, ruggedness and the rest — using the same inputs and the same threshold throughout.

It is not a survey document and not a source of record. It derives; it does not observe. What it offers is that a figure for the Chambal and a figure for the Kaveri were produced the same way, and so can be set side by side.

212named catchments, nested four levels deep
124river basins at the top level
20morphometric parameters for every one
1,342,308km of channel traced
36,239level-12 sub-basins aggregated

What you can do with it

Open a river. Or open all 212 at once.

Look it up

Any river, in one click

Catchment area, discharge, river length and people — each printed beside the published figure it should match, with a measured band for how far to trust it.

Go deeper

Four nested levels

Basin, sub-basin, tributary, sub-tributary. Twenty parameters with their formulas, a hypsometric curve, a long profile and a 3-D terrain model.

Compare

All 212 side by side

Any measurement, every catchment, on one chart. The thing a one-watershed-per-paper literature has never been able to offer.

Prioritise

Which catchments come first

The compound-parameter ranking Indian watershed planning uses, set against the number of people inside the modelled flood footprint — on separate axes, deliberately.

Check it

Eight validation checks

Most of them against evidence from outside the atlas entirely. Where NADI disagrees with the published figure, both numbers are shown.

Take it

Every table, no account

Your own browser writes the files. Nothing is uploaded, which is why the whole thing still works with the wifi off.


What it found

Three things that were not known before this was built.

Not claims. Measurements, each reproducible from the published tables.

8×Threshold over resolution

The variable nobody reports matters eight times more than the one everybody does.

Thirteen catchments were recomputed on the 30 m Copernicus model with the method held fixed. Drainage density rose by a median of 16 per cent. Moving the channel-initiation threshold by one decade moves the same quantity by a factor of three.

Resolution is stated in almost every morphometry paper. The threshold is stated in almost none. It is the one that decides the answer.

441Barriers removed

A correction the atlas published against itself.

An earlier release removed structures outside India using a bounding box, which cannot separate India from its neighbours. 441 barriers survived that filter and should not have. Every barrier was re-tested point-in-polygon against the national outline the atlas itself draws.

The count went from 7,543 to 7,102, of which 6,895 fall inside a traced catchment. The earlier figure was wrong, and it is corrected in public rather than quietly replaced.

208of 212 catchments

Where India actually watches its groundwater.

40,100 Central Ground Water Board observation wells, carrying 1,653,432 water-level readings, located inside the traced catchments. 208 of the 212 have at least one.

The four with none are Tso Moriri, Zanskar, Dibang and Tons — all Himalayan or Ladakh. Dibang is the clearest case: fourteenth on the priority ranking, and not one observation well in it.

How far it has been checked

Including the places it failed.

A number without a test beside it is an assertion. These are the tests, with the results they actually gave.

CheckAgainstResult
Modelled discharge4,101,735 daily observations at 499 Central Water Commission stationsρ 0.842
340 of 499 within ×2
Catchment areaAll 21 CWC basins, their own published areasmedian 0.978
17 of 21 within 10%
Basin runoffThe CWC 2024 reassessmentmedian 0.874
19 of 20 within ×2
Threshold scalingSix thresholds, each catchment fitted separatelymedian r² 0.987
144 of 212 at ≥0.98
Elevation model30 m Copernicus GLO-30, 13 catchments, method fixed+16% median
Himalayan dischargeNothing. No public daily record exists for the Ganga, Brahmaputra or Indusunvalidated

The last row is the one that matters most. Satellite altimetry cannot currently close that gap either: its own bias is characterised only where gauges already exist.

Who made it

One person, no institution, and everything checkable.

NADI was built by Dr Pradeepika (Praddy) Kaushik, working independently. There is no lab behind it and no grant.

That is stated plainly because it should not matter to whether the numbers are right. Every figure here is checkable by a stranger, without permission and without anyone's letterhead: the computed tables and the full validation record are archived on Zenodo under CC BY 4.0, and the atlas writes every table out of your own browser.

The build code is held privately until the method is published, and is provided to editors and referees on request.

Version
1.16 · 5 November 2026
DOI
10.5281/zenodo.23568570
ORCID
0000-0002-0767-3983
Licence
CC BY 4.0 for the computed tables and the written record
Geometry
Derived from HydroBASINS and HydroRIVERS, and published under terms written to satisfy the HydroSHEDS v1 agreement
Status
An independent research product. Not an official government dataset

Start anywhere

Click any river. See its entire story.

Nothing is held back and nothing is asked of you. No account, no sign-up, no email.